ONE
All Portugal Yacht
EN
Checklists
Large touch targets, works one-handed on deck. Progress is kept on this device.
Pre-departure
0/7 done
Weather forecast checked from two sources
Fuel and water levels, reserve calculated
Engine oil, coolant, belt, raw-water strainer
Bilge dry, bilge pumps tested
Lifejackets fitted to every person on board
VHF radio check, MOB button located
Crew briefing given, passage plan shared
Reset
Engine start
0/5 done
Engine room ventilated, no fuel smell
Seacock open
Gear in neutral, throttles closed
Start, then confirm cooling water at the exhaust
Oil pressure and charge within range
Reset
Arrival & mooring
0/6 done
Marina called, berth and side confirmed
Fenders at the right height for the pontoon
Lines rigged, bights outboard, no loops on hands
Wind and current assessed at the berth
Crew positions assigned, one voice giving orders
Springs on before slacking off engines
Reset
MOB immediate actions
0/6 done
Shout "man overboard", point continuously
Throw buoyancy immediately
Press MOB on the plotter
Engines to neutral if the person is near the props
Turn and approach from downwind, dead slow
Mayday on VHF 16 if recovery is not immediate
Reset